Report from Camp Getaway Hello Supporters
Thank you for another 2 successful days of hard work this Friday 17th and Saturday 18 July.
The list of achievements is as follows: Fit pressed metal sections to main LVL beams to take fascia cladding Fit temporary perimeter
handrails around roof so that plumbers can work safely Construct the panel link between the dining hall and new kitchen
Work on preparation for sheeting the external wall of the link Fit 2 sheets to the temporary wall to secure the kitchen until stage 2 is built
Mount the sub board, run main cable from switchboard to sub board and liven up Fit off all power points and lights Work on fire alarm system
Fit roof sheeting and flash off one penetration Insulate the box gutter Finish installation of the second heater and run both heaters
Reinstall sliding doors between halls Check for white ants and fit signs in Dorm 2
AND WHILST THERE ON SATURDAY
PDG Des and Judy Hosking along with IPP Brad Saunders AND THE MAN BEHIND IT ALL Claude Bury, all Williamstown Rotarians,
presented Camp Getaway with a new defibrillator. With the special pads Williamstown will also provide, this defibrillator will be suitable
for all children as well as adults.
On Friday there were 8 volunteers and Saturday 11 Volunteers
Thanks go to Graeme Neivandt, Bernie Young, Bendigo South Rotary Exchange Student Gus, Harold Simpson, Jim Rolfe
John Flood, Peter Kennedy, John & Matt Gallagher, Tom Dobeli, Steve & Robyn Clarke & Howard Osborne.
These supporters come from the following Rotary Clubs- Bendigo, Bendigo South, Bendigo Strathdale, Bendigo Sandhurst,
Keilor, Camberwell and Eaglehawk.
regards
Leon ScottPS The new heaters are working very efficiently and made the entire area
very comfortable and only used 3 barrows of wood for the weekend.
.............................................................................................................................................................................................................
Our next working bee dates are Friday 7th & Saturday 8th August. Melbourne Park Rotary will be there for a working bee so could be of assistance, and the
next weekend Friday 14th & Saturday 15th when Student Exchange will be there. The camp is booked out before these weekends.
It would be great if we could get Stage 1 close to finished over these 2 weeks
Tasks to do
Fit the door between hall and kitchen Fit external sheet on end link wall fit fascia, fit box & fascia gutters and rainhead and downpipe,
fit penetration flashing & fit flashings around the north end of the 2 wooden LVL beams
remove perimeter rails and scaffold dig Triple Interceptor Trap ( grease ) and put in place, connect both ends of previously laid sewer
pipe to grease trap and sewer pour a pad for the hot water service fit sink and drain trays run hot and cold water and drains
run gas lines finish off flashing temporary wall fit swampy air conditioner and run water to it including drain from swampy to sewer,
fit air diverter to ceiling fit cowl to exhaust stack fit hood in kitchen to exhaust stack fit new stove Finish any electrical work
clean up site When you look at it, I may have been a bit ambitious but it is a goal to aim towards
Don’t forget to book for catering purposes and bring your own tools please
Thanks
Leon Scott